Market insight · 2026-11-16
Roughly four blocks: material (copper alloy strip), surface finish (tin, gold or silver, priced by area and thickness), stamping and tooling amortisation (spread across the run), plus packaging, inspection and freight. Copper is only the first block.
Material moves with the market and is usually accepted as-is. Plating thickness and plating type are technical items you can discuss (moving a non-critical contact from gold to tin, for example). Tooling amortisation depends on run size, and consolidating annual volume into one build often beats haggling order by order. Packaging and minimum pack quantity also move the unit price directly.
Ask for a broken-out quotation instead of one number; confirm validity and the adjustment mechanism; put the plating specification on the drawing, not in a note; and for high-volume lines negotiate staged delivery and an annual framework rather than a fresh enquiry every time.
